RPE calculator: 1RM and weights by RPE
Enter a set with the RPE you gave it. You get an estimated one rep max, and the weights that match any reps and RPE from 6 to 10.
Calculator
Working weights by reps and RPE
These weights come from the estimated max above, rounded to the nearest 0.5. Pick the reps and the RPE you want and read the weight across.
| Reps | RPE 10 | RPE 9 | RPE 8 | RPE 7 | RPE 6 |
|---|---|---|---|---|---|
| 1 | 123.5 | 118 | 113.5 | 110 | 106.5 |
| 2 | 118 | 113.5 | 110 | 106.5 | 103 |
| 3 | 113.5 | 110 | 106.5 | 103 | 100 |
| 4 | 110 | 106.5 | 103 | 100 | 97 |
| 5 | 106.5 | 103 | 100 | 97 | 94 |
| 6 | 103 | 100 | 97 | 94 | 91 |
| 7 | 100 | 97 | 94 | 91 | 87 |
| 8 | 97 | 94 | 91 | 87 | 84 |
| 9 | 94 | 91 | 87 | 84 | 80.5 |
| 10 | 91 | 87 | 84 | 80.5 | 77 |
With the example set, 100 kg for 5 reps at RPE 8, the table says 5 reps at RPE 9 is about 103 kg and 5 reps at RPE 7 about 97 kg.
What RPE and reps in reserve mean
RPE is the rate of perceived exertion of a set on a scale up to 10. In strength training it is read as how many reps you had left: RPE 10 is a set to failure with nothing in the tank, RPE 9 leaves one rep, RPE 8 two reps, RPE 7 three. The same idea is called reps in reserve, or RIR, so RPE 8 is 2 RIR.
The RPE scale for lifting was popularised by Mike Tuchscherer of Reactive Training Systems. It lets you prescribe heavy work without a fixed percentage: a day of 3 reps at RPE 8 asks for the weight that moves smoothly for three with two to spare, whatever your max is that week. The calculator turns that feeling into a number by looking up the percent of your one rep max in the chart below.
How to use it: after a set, ask how many more reps you could have done with the same form, subtract that from 10 and you have the RPE. RPE is a judgment call, and it gets better with practice, especially if you take a few sets close to failure to see what that feels like.
RPE chart: percent of 1RM by reps and RPE
The chart is the one in wide use for RPE training: the share of your one rep max you can lift for a number of reps at a given RPE. The estimated max is the weight lifted divided by that fraction, so 100 kg for 5 at RPE 8 (81.1 percent) is 100 / 0.811, about 123.3 kg.
| Reps | 10 | 9.5 | 9 | 8.5 | 8 | 7.5 | 7 | 6.5 | 6 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | 100.0 | 97.8 | 95.5 | 93.9 | 92.2 | 90.7 | 89.2 | 87.8 | 86.3 |
| 2 | 95.5 | 93.9 | 92.2 | 90.7 | 89.2 | 87.8 | 86.3 | 85.0 | 83.7 |
| 3 | 92.2 | 90.7 | 89.2 | 87.8 | 86.3 | 85.0 | 83.7 | 82.4 | 81.1 |
| 4 | 89.2 | 87.8 | 86.3 | 85.0 | 83.7 | 82.4 | 81.1 | 79.9 | 78.6 |
| 5 | 86.3 | 85.0 | 83.7 | 82.4 | 81.1 | 79.9 | 78.6 | 77.4 | 76.2 |
| 6 | 83.7 | 82.4 | 81.1 | 79.9 | 78.6 | 77.4 | 76.2 | 75.1 | 73.9 |
| 7 | 81.1 | 79.9 | 78.6 | 77.4 | 76.2 | 75.1 | 73.9 | 72.3 | 70.7 |
| 8 | 78.6 | 77.4 | 76.2 | 75.1 | 73.9 | 72.3 | 70.7 | 69.4 | 68.0 |
| 9 | 76.2 | 75.1 | 73.9 | 72.3 | 70.7 | 69.4 | 68.0 | 66.7 | 65.3 |
| 10 | 73.9 | 72.3 | 70.7 | 69.4 | 68.0 | 66.7 | 65.3 | 64.0 | 62.6 |
Read it by reps down the side and RPE across the top. Moving one RPE point is the same as moving one rep: 3 reps at RPE 10 and 1 rep at RPE 8 are both 92.2 percent. The chart covers 1 to 10 reps and RPE 6 to 10.
How far to trust it
The chart is an average. Two lifters can have different percentages at the same reps and RPE, and the estimate is looser for sets of 8 or more reps. Different reproductions of the chart also disagree slightly at the low end, for reps 7 to 10 at RPE 7 and below, so numbers there are a guide rather than a fact.
The weak point is the RPE itself. A set rated RPE 8 that was really RPE 9 overstates your max by about 3 percent at 5 reps. Use the estimate to compare like with like over weeks, and let a heavier set at the same RPE tell you that you are getting stronger. The 1RM calculator does the same job from reps alone, with the Epley formula, for sets taken close to failure.
Logging RPE in a journal
RPE only helps if you write it down. In the AIm app each set records its weight and reps, and the whole workout gets one difficulty rating. An RPE for a single set is saved when you tell Claude or ChatGPT: AIm stores it with the set. The estimate AIm shows for an exercise, on its progress page, uses weight and reps only and does not read RPE, so for an RPE based number use this page.
Other tools in this set: the 1RM calculator (your one rep max from any set), the DOTS calculator (DOTS and Wilks scores), the plate calculator (plates per side for a barbell), the tonnage calculator (the volume load of a workout).
Sources
- Sensai, RPE to percentage chart
- FitnessVolt, the Tuchscherer RPE chart explained
- Reactive Training Systems, Mike Tuchscherer
- Helms, Morgan and Valdez, A Guide To Using RPE and RIR In Your Training
The first two print the same chart as this page for RPE 6.5 to 10, to the digit. The RPE 6 column is also on the first, and the whole percents of RPE 6 agree on a third page. One more reproduction smooths reps 7 to 10 differently; this page follows the chart the others print.
Frequently asked questions
How do I calculate 1RM from RPE?
Look up the percent of 1RM for your reps and RPE in the chart, then divide the weight by that percent. 100 kg for 5 reps at RPE 8 is 81.1 percent, so 100 / 0.811 gives about 123.3 kg.
What is RPE 8 in reps in reserve?
RPE 8 is two reps left in reserve: you stopped two reps short of failure. RPE 9 is one rep in reserve and RPE 10 is no reps left.
What percent of 1RM is RPE 8 for 5 reps?
81.1 percent on the Tuchscherer chart. RPE 9 for 5 is 83.7 percent and RPE 7 for 5 is 78.6 percent.
Is the RPE chart accurate for everyone?
It is an average, so it fits some lifters and lifts better than others, and it is looser for higher reps. Use it to track your own trend.
Why does the chart stop at 10 reps?
The chart is a table for sets of 1 to 10 reps. For longer sets, track the weight and reps and compare them over time, or use the 1RM calculator, which counts up to 20 reps.